Tuesday, May 20, 2014

ShaneAO Status Report

Compiled for the UCOAC meeting at UCLA on Wednesday 5/21


Present Status

  • ShaneAO has completed two engineering runs (one in April, one in May) 
  • Now in the midst of the first shared-risk observing nights.
  • We have commissioned both natural guide star (NGS) and laser guidestar (LGS) modes for observing. Most systems are checked out and working well: 


ShARCS
  • ShARCS cold stop aligned to telescope pupil - much improvement in background over IRCAL's emissivity 
AO Natural Guide Star Mode
  • Bright star NGS AO @ 1.5kHz correction - high Strehl (~0.8 ish, as expected in K) 
  • Dim NGS down to 12'th mag - M92 picture was taken  with an 11'th mag NGS 
AO Laser Guide Star Mode
  • LGS locked in 16x and 8x modes (16x, 8x = wavefront sensing at 16, 8 samples across the aperture respectively) - Laser is dim this time of year, so not much correction, but it locked and is stable 
  • Laser uplink tilt correction working 
  • Dim tip/tilt star in LGS mode, worked down to 15th mag., goal is 16th 
  • LGS mode field steer to tip/tilt star >50 arcsec off-axis and lock
Observing Scripts
  • Nod along spectrograph slit - done, but cumbersome, needs some work 
  • NGS mode field steer - not very accurate and needs work - automatic nodding scripts close, but not quite finished. 
  • Still needs to be done: 
    • flexure compensation models for long exposures - needs data collection and implementation 
    • field rotation (align along slit via Cass tub rotation) - needs checkout 



No comments:

Post a Comment